Skip to product information
1 of 6

Risk Assessment And Method Statements (RAMS) Board Sign Color : Yellow

Risk Assessment And Method Statements (RAMS) Board Sign Color : Yellow

RAMS

Regular price $4,748.36 CAD
Regular price Sale price $4,748.36 CAD
Sale Sold out
Estimated Ship Time 10-15 Business Days
Shipping calculated at checkout.

Ships From Manufacturer

SKU:PBR101YL

Carbon-neutral shipping with Shopify Planet
Carbon-neutral shipping on all orders

 

RAMS Board Communication Centers

Make all documents and safety info visible and accessible from anywhere with the cutting-edge, robust, and eye-catching Risk Assessment and Method Statements (RAMS) Board. Perfect for lockout stations, health and safety documents, PPE distribution points, lean manufacturing, and more. Guarantee high visibility in any workplace!

Features 

  • Made of durable, UV stable, weatherproof HDPE
  • Easy to clean, reusable, and recyclable plastic
  • Simply mount included accessories to board*
  • Free-standing when assembled with leg supports or board only can be wall-mounted
  • Leg supports can be filled with water or bolted down for added stability (hardware included)
  • Configure accessories in any arrangement
  • Outer Dimension: 88-inchH x 73.6-inchW x 39.37-inchD
  • Product Weight: 127.31 lbs.
  • Average assembly time is 30 minutes
  • Dismantles for transport in approx. 5 minutes.

Includes:

  • Six transparent A4 size pockets (each pocket can hold up to 100 sheets)
  • Storage tray/pocket measures 4"H x 60"W
  • One Magnetic White Board 18" x 27"
  • One "Meet the person responsible for your safety" mirror 11"H x 8"W
View full details
Your cart
Product Product subtotal Quantity Price Product subtotal
Risk Assessment And Method Statements (RAMS) Board Sign Color : Yellow
Risk Assessment And Method Statements (RAMS) Board Sign Color : YellowPBR101YL
Risk Assessment And Method Statements (RAMS) Board Sign Color : YellowPBR101YL
$4,748.36CAD/ea
$0.00CAD
$4,748.36CAD/ea $0.00CAD

Join the PartnerPlus Program

Get fast delivery, bulk pricing, exclusive business discounts, and VIP savings on subscription auto-refill orders. Plus, take advantage of our VMI (Vendor Managed Inventory) solutions to keep your team stocked effortlessly.